Structural Survey or Statement
Last updated October 29, 2026.
Local validation checklist code B7
When you'll need to provide this
You may need to include this if you're submitting your planning application to either Swale or Maidstone borough councils.
For applications submitted to either Swale or Maidstone borough councils
These requirements apply to applications sumittted to either Swale or Maidstone borough councils.
- Conversions of buildings in the countryside where applicant is relying on the building being structurally sound
- Proposed works to a listed building that involve demolition or affect the structural integrity of the building (this includes works to remove, or reinforce elements of an existing listed building)
Typical proposals
The structural survey or statement planning application requirement is typically needed when you're proposing to do any of the following:
Home extension or alteration; Converting a building into homesWhat you'll need to provide
What you'll need to include in your application
For applications submitted to either Swale or Maidstone borough councils
The report should be prepared by a Chartered Structural Engineer with expertise in the type of work involved and should, amongst other things, justify the extent and nature of any proposed structural work and/or the need for demolition.
Why we need you to provide this
Why we need you to include this in your application.
For applications submitted to either Swale or Maidstone borough councils
A structural survey will be required in support of an application if the proposal involves substantial demolition, reconstruction, or alteration of an existing building. It will also be required in order to demonstrate that certain types of building (for example traditional farm buildings, listed buildings etc) are structurally sound and capable of being developed without the need for substantial demolition and/or reconstruction.