Strategic Housing and Economic Land Availability Assessment (SHELAA) entry SHELAA/024
Created on Friday 13 March, 2026
Updated on Tuesday 5 May, 2026
Suitable for housing
SHELAA/024 has been considered for housing.
Suitable for employment
SHELAA/024 hasn't been considered for employment.
Source of site
Call for Sites 2017.
Original references
SHELAA/024 refers to the following:
- SLA18/118
Details of these references can be found on our evidence page.
A:
- REG prefix relates to the Regulation 18 consultation in 2021 (SBLP Issues and Preferred Options (Reg 18) - Details - Keystone)
- LPR prefix relates to our Regulation 19 consultation in 2021 (The Local Plan Review 2021 (Reg 19) - Details - Keystone)
Other reference variations relate to sites submitted before 2021.
Ward and parish split
SHELAA/024 is split into the following:
Ward
- 100% Borden and Grove Park
Parish
- 100% Borden
Site size
SHELAA/024 is approximately 0.93 hectares
Dwellings
The number and type of dwellings SHELAA/024 is able to support.
Greenfield
- developable area 30 dwellings at 40dph
- 28 dwellings at 30dph
- 37 dwellings at 40dph
Wider urban
SHELAA/024 could include 0 wider urban dwellings at 50 dwellings per hectare (dph).
Central urban
SHELAA/024 could include 0 central urban dwellings at 60 dwellings per hectare (dph).
Urban, fringe, or urban fringe
Urban Fringe.
Settlement hierarchy
More information about settlement hierarchies is available in our settlement hierarchy study (PDF 628kb).
Brownfield, greenfield, or mixed
Greenfield.
Availability
Available.
Achievability
Achievable.
Location
Land North of/Adjacent to 124 Borden Lane.
Size
0.93 hectares.
Download
Download this dataset (CSV 1210kb)Last updated Tuesday 5 May, 2026.
Spotted a mistake? Email Lpcomments@swale.gov.uk